HIGHLIGHTS Interior Refurbished December 2022 Full Re-Strip & Paint December 2022 VMAX – Gold Engine Program Enrolled Nine (9) Passenger Configuration FAA Part 135 Certified for Charter Operations No Damage History
Airframe: Total Time: 5,316 Total Landings: 3,779
Engines: VMAX – GOLD COVERAGE Scheduled Overhaul Life Limited Parts Rental Lease Engine Coverage Engine Parts (Excl. Life Limited Parts) Transfer of Benefits for Flat Fee Engine Trend Monitoring Service Bulletins, Category Required Trouble Shooting Labor Line Removal/Installation Labor Engine Shop Labor Engine Accessories Freight for Engine, Parts, Accessories Engine Removal, Basic Unscheduled (BUER) Hot Section Inspection, Scheduled or Required (on-wing) Mobile Repair Team for Unscheduled AOG