Airframe: Total Time: 4,866.1 Total Landings: 3,839
Engines:
Engine 1: Pratt & Whitney JT15D-5 SN: PCE-JA0476 Engine Total Time: 4825.6 Engine Total Cycles: 3803 Engine Time Since Overhaul: 1311 Engine Cycles Since Overhaul: 1119
Engine 2: Pratt & Whitney JT15D-5 SN: PCE-JA0477 Engine Total Time: 4765.5 Engine Total Cycles: 3757 Engine Time Since Overhaul: 1311 Engine Cycles Since Overhaul: 1119
Aircraft status tracked via FlightDocs Aircraft currently operated under the IFA (increased flight activity) program. IFA-A Inspection next due: 10/31/2025 or ATT 5241.8 IFA-B Inspections next due: ATT 5466.4 IFA-C Inspection next due: ATT 5114.4 IFA-D Inspection next due: ATT 6400 Several lubrication items, engine minors and other small inspections showing on due list scheduled to be completed prior to 1/1/2025. #2 engine starter generator scheduled for replacement prior to 1/1/2025.