EASA Air Ops Compliant Engines are covered by the MSP program Interior was refurbished in 2022 Exterior paint done in 2016 Two DU-875 pilot displays Spectrum stretcher STC is installed (Stretcher is not included in the price) Phase C done in Aug 2023 Phase D done in Mar 2022 No known damage history