Описание двигателей:
The power turbine (PT) governor underwent an overhaul,
completed on December 21, 2023. The engine, in conjunction with
a 1,200-hour component inspection, underwent major overhaul-
related work, which was completed on April 18, 2026 (at 2,319.7
operating hours).
Авионика:
Cabin heating system (12-month inspection item); footstep/handhold; folding maintenance step; high-skid landing gear and cross-tubes (STC-approved modifications); Emergency Locator Transmitter (ELT) (model ME406HM); air conditioning system not installed; equipped with agricultural spraying equipment.
Состояние осмотра:
Latest 100-hour/12-month periodic inspection: August 19, 2026 (at 2,333.4 airframe hours); 12-month inspection: April 12, 2026 (2,319.7 hours); 300-hour inspection: August 17, 2025 (2,316.95 hours); 1,200-hour component inspection/overhaul: April 18, 2026 (2,319.7 hours); weekly/1-month inspection: August 9, 2026. All periodic inspections are currently valid. The next 100-hour/12-month periodic inspection is due at 2,433.4 hours or on August 19, 2027.